1. Counting small parts crossing a discharge path
A discharge guide can pass separated opaque parts through the 50 mm detection height and feed the Q signal to external counting logic. The 26-beam array accommodates variation in crossing position within that height. Commissioning checks actual part coverage and separation against the distance-dependent minimum-object curve and the 3 ms resistive-load response before establishing the usable passage rate.
Problem Solved
An interruption across the beam array gives external counting logic a passage event, helping register small parts whose trajectories vary within the installed detection height.
Small-part counting
Beam array
External counter
2. Monitoring loss of opaque material in a feed path
A feeder can arrange the grid across a guided opaque web or strip so normal material interrupts one or more beams. A complete break or run-out that clears the monitored path changes Q and Q̅, which external feed logic evaluates for its process response. Setup verifies material coverage, guide movement, optical alignment and the installed sender/receiver separation.
Problem Solved
A clear-path transition gives external feed control a material-loss reference, helping distinguish normal beam interruption from a break or run-out that leaves the monitored path open.
Material continuity
Feed monitoring
Clear-path transition
3. Diagnosing optical setup during commissioning
Commissioning staff can teach the installed optical arrangement and use the receiver LEDs to distinguish a blocked path from synchronization, weak-signal or device-error conditions. The cable-synchronized sender and receiver are aligned within the intended operating separation. External machine motion remains controlled by the commissioning procedure while the engineer checks teach completion and the complementary output states.
Problem Solved
Separate optical and diagnostic indications help commissioning identify why an expected switching state is missing, supporting targeted alignment, synchronization or wiring checks before normal process operation.
Commissioning diagnostics
Receiver LEDs
Cable synchronization