1. Legacy PLC System Modernization
Upgrading an obsolete C200H CPU to a modern CS1-series controller while retaining the existing C200H I/O modules and field wiring.
Problem SolvedEliminates the need to rip-and-replace entire I/O subsystems, saving significant capital and rewiring downtime.
Backwards CompatibilityI/O BackplaneLegacy Migration
2. High-Density Control Cabinet Expansion
Adding an expansion I/O rack directly adjacent to or below the main CS1 CPU rack within a standardized industrial control panel.
Problem SolvedResolves spatial constraints when the main CPU backplane has exhausted all available module slots, enabling localized scaling.
Expansion RackControl CabinetI/O Density
3. Tiered Automation Subsystems
Linking a central CS1 processing rack with a dedicated C200H analog or specialized I/O rack located on the tier immediately below.
Problem SolvedProvides a reliable, high-speed 0.7m physical bus link that guarantees synchronized communication without signal degradation across physical tiers.
Bus CommunicationData AcquisitionSignal Integrity